RAS was contracted to obtain 60 points per meter LiDAR data covering a 58-acre powerline corridor. RAS processed this LIDAR utilizing TerraSolid and PLS-CADD software. As part of the project a bare earth DEM/DTM model, vector string model, classified LiDAR and PLS-CADD files were delivered. A LiDAR report and FGDC compliant metadata were included.
RAS was also contracted to provide 0.25 foot ground-sample-distance resolution orthophotography covering the site. Orthophotos were delivered in ECW and uncompressed GeoTIFF formats.